輕型鋼結構施工的5個關鍵環節

來源:http://www.szdim.com.cn 日期:2026-06-28 發布人: 瀏覽次數:1

輕型鋼結構的施工安裝,每個環節都有嚴格的技術要求。以下5個關鍵環節,是保障結構安全的底線。

The construction and installation of lightweight steel structures have strict technical requirements at every stage. The following five key steps are the bottom line for ensuring structural safety.

環節一:構件進場檢驗與預處理

Step 1: Component Entry Inspection and Pre treatment

構件進場時需進行嚴格檢驗。輕鋼結構采用的鋼材應具有抗拉強度、伸長率、屈服強度以及硫、磷含量的合格保證。對焊接承重結構的鋼材,尚應具有碳含量的合格保證和冷彎試驗的合格保證。

Strict inspection is required upon entry of components. The steel used in light steel structures should have qualified guarantees for tensile strength, elongation, yield strength, and sulfur and phosphorus content. The steel used for welding load-bearing structures should also have qualified guarantees for carbon content and cold bending tests.

環節二:基礎復測與預埋件校準

Step 2: Basic retesting and calibration of embedded parts

基礎施工是輕鋼結構的第一道關口。地腳螺栓的埋設是關鍵控制要點。預埋件位置偏差直接影響后續鋼柱安裝精度。基礎復測需確保標高、軸線位置符合設計要求。

3b697c8b-9388-467b-99d5-91a0dd1ae5ac

Basic construction is the first hurdle for light steel structures. The burial of anchor bolts is a key control point. The positional deviation of embedded parts directly affects the installation accuracy of subsequent steel columns. Basic retesting must ensure that the elevation and axis position meet the design requirements.

環節三:鋼柱與鋼梁吊裝

Step 3: Hoisting of steel columns and beams

鋼柱與鋼梁的吊裝是主體結構安裝的核心環節。施工順序和施工中的構造措施必須得當。施工人員要嚴格遵守施工規范,采用合理的施工順序,安裝必要的構造措施,保證實際結構與計算模型的一致性。

The hoisting of steel columns and beams is the core link in the installation of the main structure. The construction sequence and construction measures must be appropriate. Construction personnel must strictly comply with construction standards, adopt a reasonable construction sequence, install necessary structural measures, and ensure consistency between the actual structure and the calculation model.

環節四:檁條及支撐系統安裝

Step 4: Installation of purlins and support systems

檁條及支撐系統安裝直接影響屋面和墻面的穩定性。簡支、小跨度的檁條宜選用Q235A等級的鋼材。連續或大跨度的檁條宜選用Q345A等級的鋼材。當由強度控制設計時宜用Q345A級鋼材,充分利用其屈服強度高的優勢。當由剛度控制設計時宜用Q235A級鋼材。

The installation of purlins and support systems directly affects the stability of roofs and walls. Simple supported and small span purlins should be made of Q235A grade steel. Continuous or large-span purlins should be made of Q345A grade steel. When designing with strength control, it is advisable to use Q345A grade steel to fully utilize its high yield strength advantage. Q235A grade steel should be used when designing with stiffness control.

環節五:屋面與墻面系統施工

Step 5: Construction of Roof and Wall Systems

屋面與墻面系統施工是輕鋼結構工程的收尾環節。鋼骨架輕型屋面板通過鋼框與鋼結構網架支托焊接連接為一體。屋面板在工廠內提前加工,實現工廠化施工。

The construction of roof and wall systems is the final stage of light steel structure engineering. The steel skeleton lightweight roof panel is welded together with the steel frame and steel structure truss support as a whole. The roof panels are processed in advance in the factory to achieve factory construction.

年新增的強制性要求:

New mandatory requirements added in the year:

年起,住建部《鋼結構工程全過程監管清單》強制執行。地質詳勘報告必須加蓋注冊巖土工程師章(軟土地基必須做靜力觸探+深層沉降模擬)。結構計算書必須上傳至“全國鋼結構審圖云平臺”完成AI輔助復核。防火涂料施工前,必須對鋼構件表面粗糙度做Ra3.2μm激光檢測并留影像存檔。

Starting from [year], the Ministry of Housing and Urban Rural Development has enforced the "Supervision Checklist for the Whole Process of Steel Structure Engineering". The geological survey report must be stamped with the seal of a registered geotechnical engineer (static cone penetration test+deep settlement simulation must be conducted for soft soil foundation). The structural calculation sheet must be uploaded to the "National Steel Structure Drawing Review Cloud Platform" for AI assisted review. Before the application of fireproof coating, the surface roughness of steel components must be tested by Ra3.2 μ m laser and photographed for archiving.

設計院出的藍圖≠施工圖。真正能拿去下料的,是經深化單位BIM拆圖、焊縫標注、螺栓孔位三維定位后的加工詳圖,此圖必須由原設計蓋章確認。

The blueprint produced by the design institute ≠ the construction drawing. What can truly be taken for cutting is the detailed machining drawing after deepening the unit's BIM disassembly, welding seam annotation, and three-dimensional positioning of bolt holes. This drawing must be confirmed by the original design seal.